Construction of a "sustainable" bicycle route "singletrack", as part of the project PLSK.01.01.00-18-0152 / 17 p.n. "Porta Rusica - from Połoniny to Bieszczady" covered the areas of forest land owned by the State Treasury under the management of the State Forests National Forest Inspectorate, Cisna Forest District. A sustainable cycle route with a width of 1 m and a length of about 14.255 km with technical infrastructure.
As part of the investment, small architecture objects were placed on the bicycle route: i.e. route markings, information boards, bicycle stands, culverts, a bicycle repair station (not being a mechanical plant).
As part of the project, additional structures were constructed, such as a roller, a wooden footbridge with handrails, a table and a profiled bend. The average slope of the route between the peaks of slope reversals does not exceed 15%. The bicycle route has been integrated into the natural profile of the terrain. The surface of the path being built is hardened with crushed stone and fine grain.